Nemi Engineering Services - Engineering Consultants & Contractor for building of Bridges, Road Over Bridges, River under bridges using Box Pushing, Pipe Jacking, Casing Pipe, Trenchless Technology, Pipe Pushing, Push Through,  Box Pushing, Rub, Under Pass, Subway, Culvert By Pushing, Jack Through in Baroda, Gujarat, India
Home | Organisation | Methodolgy | Projects | Inquiry | Contact Us
  “ Registration as Approved Contractor in AA Class with Government of Gujarat”
 
 
 
Nemi Engineering Services - Engineering Consultants & Contractor for building of Bridges, Road Over Bridges, River under bridges using Box Pushing, Pipe Jacking, Casing Pipe, Trenchless Technology, Pipe Pushing, Push Through,  Box Pushing, Rub, Under Pass, Subway, Culvert By Pushing, Jack Through in Baroda, Gujarat, India
 
Nemi Engineering Services - Engineering Consultants & Contractor for building of Bridges, Road Over Bridges, River under bridges using Box Pushing, Pipe Jacking, Casing Pipe, Trenchless Technology, Pipe Pushing, Push Through,  Box Pushing, Rub, Under Pass, Subway, Culvert By Pushing, Jack Through in Baroda, Gujarat, India
 
 


   
   
Completed Projects
List of major works already completed
M/s. Nemi engineering services.
Sr. No. Name fo work place Cost of Completion Rs. in Lacs Name of Divison or Authority Dt. of award of contract Status of work
01. Construction of R.C.C. Box of size 1.0 x 1.5m and 1.5 x 1.5m for Narmada Canal Crossing. 50.16 W.Rly. Ahmedabad Division June 2000
Completed
02. Construction of R.U.B. by pushing at Dahisar for W.Rly size 6.00 x 2.55 110.56 W.Rly Mumbai Division Aug
2000
Completed
03. Construction of R.C.C. Box by pushing system at 13 location of size 1.0x 1.5mt. 86.75 W.Rly Baroda Division
Division
April
2001
Completed
04. Construction of R.C.C. Box by pushing system of size 2.5 x 1.5 at Amalsad for W.Rly. 19.3O W.Rly
Mumbai
Division
April
2001
Completed
05. Construction of R.U.B. at Jaipur for W.Rly of size 8.5 x 6.06 Twin. 187.25 North
W.RIy
Jaipur
Oct
2001
Completed
06. Replacement of Aged steel girder by R.C.C. slabs up to 6.10m span between SURAT-MIYAGAM Section of W.Rly. 52.3 8 W. Rly
Baroda
Division
Jun6
2000
Completed
07. Pushing of RCC pipe 900mm dia below Railway track and casting of retaining wall including with Cement and Steel. 16.90 W. R ly
Baroda
May
2001
Completed
08. Construction of Canal Crossing for Narmada Nigam by providing R.C.C. Boxes of size 3 x 2.6 ( Twin ) and 1.9 x 1.8 twin for NCX 172, & NCX-24 110.45 W. R ly
Baroda
May
2001
Completed
09. Tender No Dy.CE / S&C / 294 Providing RCC Box of 2.00m x 1.60m by jacking method through Rly embankment for Aladar Distributory on Samni-Dahej Section of Wrly. 16.74 W.R
Baroda
Division
Oct
2002
Completed
10. Tender No. Dy. CE / S&C / 295 Providing RCC Box of 2.00 x 1.60m by Jacking Method Through Railway Embankment for Limdi Distributory on Samni – Dahej Section of W.Rly. 29.40 W.Rly
Baroda
Division
Oct
2002
Completed
11. Construction of Road Under Bridge at km. 23.088 by box pushing technique consisting of RCC boxes of 9.50m x 5.325m and 7.50 x 5.325m between Palam and Bijwasan Station on Delhi-Rewari Section of N.Rly. 501.00 N. Rly
Delhi
Division
Oct
2002
Completed
12. Providing 6.0Mtr. wide Foot Under Bridge for Pedestrians in lieu of LC No.35 at K.M. 41/14-15 below Running tracks of suburban section of Mumbai Division of Western Railway 105.43 W.RIy
Mumbai
Division
Dec
2002
Completed
13. Providing Viramgam II Branch Canal Crossing by Box pushing for Br. No. 33/A: 2 x 4.00 x 2.25m RCC twin Box siphon at Rly on Kadi and Katosan Road 56.57 W.Rly
Mumbai
Division
April
2003
Completed
14. Tender No. GWIL/ADB/RLY/CNC-19 Construction of RCC Box culvert for crossing Railway Track for package CNC-18 for district of Jamnagar. 50.00 GWIL
Jamnagar
Govt.
Gujarat.
Nov.
2003
Completed
15. T. No. Dy CE / Bridge / Line /NWR/1/ 2003-04 For casting & launching of P.S.C. girder of 12.2mtr span…. of Major Bridge No.90, 44,153, … between Rewari-Jaipur for MCG standard of loading. 171.00 Dy CE
( B )
N.W.Rly
Jaipur
Sept
2003
Completed
16. Providing pushing / Laying casing pipe at different location of Rly crossing for western AUDA WSP for Baroda Division Tender No. 2/3 at km 511/1-2 at Habatpur, km 507/18-19 at Gota and km 512/16-17 at shilaj. 23.00 Executive
Engineer
AUDA
A' bad
April
2004
Completed
17. Const. of 2 Nos. of RUB opening 4M + 3M by pushing method under Rly. Track at Talvadiya Khirkiya main line Diversion Project. 55.00 Dy. Chief
Engineer
C.Rly
Bhopal
March
2004
Completed
18. Const. of RCC Box of Size 2 x 4.9 x 3.8 Canal siphon by Box pushing system at km 629 / 14 – 630 / 1 on Surendranagar – Rajkot Railway line of W.Rly 105.94 Dy Chief
Engineer
W.Rly
Baroda
Nov
2003
Completed
19. Construction of RCC Box RUB of size 4.2 x 6.0m (clear ) at Km. 512/20 for Sea Bird Rehabilitation. 89.90 Dy CE (H.Q.) Konkan Rly Belapur April
2005
Completed
20. Construction of RCC box of size 2.3 x 2.45 ( Internal Dimension ) for Dharoi Extended Main Canal Crossing under Railway track at km 687/7-8 between Kamli-Siddhpur. 35.00 XEN
Dharoi
Cannel
Divisions
Vishnagar
May
2005
Completed
21. Construction and Insertion of precast Box by pushing technique …..Km 7/5-6 near Pilundra of Sujalam Sufalam Spreading channel. 198.00 M. D.
GWRDC
Ltd.
Gnadhinagar
May
2005
Completed
22. Tender No. DRM/BRC/81 of 2006-07. Kosamba-Umarpada (NG) section Rebuilding of Various bridges by providing 1200mm dia RCC Pipe 25.44 DRM
W. RIy
Baroda
Division
Nov
2006
Completed
23. Tender No. Dy CE ( C ) 1V / 30 for the work of Rebuilding of Bridge No. 263 ( 2 x 18.3 x 2 x 4.5 ) between Bhilad and Karambedi station…..by providing RCC Twin boxes of size 2m x 7.0m x 7.3m of Virar–Surat section of Mumbai Division 259.68 DY CF
(C) W.Rly Baroda
August
2006
Completed
24. All Civil Engineering & Connected works…..for Palwal Bhuleshwar 3rd line ( 81 Km ) on North Central Railway Box Pushing work in particular. 350.00Lacs
(Excluding
cost of
Cement &
Steel)
RVNL
(Work)
Delhi Era
Const .JV
with Nemi
Engg Services
June
2006
Completed
25. Tender No. Dy CE / Br / DDR / 2005 / 4. Strengthening of Bridge No. 411 ( 2 x 18.3m span ) at Km. 242 / 17-19…and Surat station of Virar-Surat section of Mumbai Division by jacketing. 283.00 Dy CE
/Bridge
W.Rly
Mumbai
April
2006
Completed
26. Tender No. Dy CE / C / 351 Construction ROB on Baroda – Savli Road between Baroda & Pilol station 304.37 Dy CE (C)
W.Rly
Baroda
Jan
2007
Completed
27. Dhuvaran siding (GEB) Providing 6 X 2.5 and 400mm dia thick RCC box by pushing method at Dhuvaran and also 1200dia RCC pipe at. 53.78 Sr.
Divisional
Engineer
(North) W.
Rly Baroda
February
2008
Completed
28. Providing and Laying 600mm dia water pipe through 1200mm dia M.S. casting pipe under Railway track at km 55/5-61 bt. Vijapur Ambalikyasan station a crossing at ch.14685mt06. 17.08 XEN, Dharoi Head Works Division February
2008
Completed
29. Construction of four lane Road Over in lieu of Level Crossing No. 230 on GIDC – Vadsar Road at KM 390/4-6 between Makarpura & Vishvamitri Stations ( Double line BG electrified section, Surat – Baroda Section) PSC I Girders on RCC Pile foundation & RCC Substructure as per GAD. 312.78 Dy CE (C)
W.Rly
Baroda
May
2008
Completed
30. Construction of 7.0m x 2.0m RCC Box by Box pushing method at km 711/770 of Konkan Railway. 166.00 Dy.CE/HQ
Konkan Railway
Corporatio
n Ltd.CBD,
Belapur
April
2009
Completed
31. Construction of Road Over Bridge at jetalpur at Rly Km 395/10 Nr Baroda Station 291.14 Western Railway , Baroda March-
2010
Completed
32. Construction of RUB nr unjha at L C No 200 / A on Ahmedabad-Delhi b.g 163.30 Western Railway, Ahmedabad June-
2010
Completed
33. DRM BRC 506 OF 2008 for Kawas siding : Providing RCC Box Bridges of different locations/sizes at i.e.(6.10m x 2.00m x 450mm thick) of 11 Nos.at Km.0/4-10=03 Box Km.0/10-20 = 04 boxes and L, 0/20-1/4 = 04 Boxes at - 471.31 Western Railway , Baroda August-
2009
Completed
34. Tender No.Dy.CE/C/391 – “ Construction of ROB in lieu of LC No.2(Lalbaug) between stations PRTN-JMB(NG) section at Rly.Km.1/15-2/1.” 229.49 Western Railway , Baroda Oct-
2010
Completed
35. Tender No. CEN00AGC1111 DTD.04/04/2011: Construction of Limited Height Subway in lieu of L-xing No.72 at Km.1249/3-5in Tundla yard by pushing method with cover shed, road work boundary wall and other misc. works. 646.24 North Central Railway,Agra Sept.-
2011
Completed
36. Tender No.DY. CE(C)I/ADI/ NCX-174, 175, 176 & 32/1 dtd. 21-10-2011 NCX-174 : Providing 1 x 1.00 x 1.65 M (Internal Dimension) ….RCC Box siphon for Morbi Branch Canal Crossing at Rly. Km.629/13-14on Surendra nagar – Rajkot (BG). 110.17 Western Railway, Ahmedabad Dece-
2011
Completed
37. Tender No. Dy.CE/C/407 dated 05/12/2011 Construction of Road Over Bridge in lieu of LC No.160 at km 296/26-28 between Kim Kosamba stn. of ST-BRC section. 713.96 Western Railway , Baroda March-
2012
Completed
38. Tender No. DRM BRC 105 of 2012-13 : Baroda division : Providing RCC Box (4.00 x 2.50m) for cross drainage of storm water drain at Km.5/0-1 between station Pratapnagar-Dabhoi section. 100.56 100.56 Jan-
2013
Completed
38. Tender No. DRM BRC 105 of 2012-13 : Baroda division : Providing RCC Box (4.00 x 2.50m) for cross drainage of storm water drain at Km.5/0-1 between station Pratapnagar-Dabhoi section. 100.56 100.56 Jan-
2013
Completed
39. Tender No.DRM/ADI/195 of 2012-13 : Proposed laying of storm water drain pipe 800mm dia RCC water carrier pipeline through 2400 mm x 2400 mm R.C.C Box along road no. 6 under the track at km GEB2/3-4 73.16 Dy.CE (C) I,Western Railway,Ahmedabad Jan-
2012
Completed
40. Tender No.DRM BRC 16 of 2013-14 Proposed laying 1422 mm dia MS water pipe encased in 2.50 m x 2.00 m RCC box(including construction of Box) near Bridge No.460 under the track @ Km.273/20-22 between Utran & Kosad sttions on Surat - Baroda section (Reinvited). 179.18 DRM(WA) Baroda Sept-
2013
Completed
41. Tender No.RTM/MHOW-PAT ALPANI/ROB/11 : Constr uction of Road Over Bridge ( Two lane) span of 1x 30.00m on pile foundation, substructure …. in lieu of L-xing No. 260 at KM. 514/05-06 between Mhow - Patalpani station on RTM – KNW section of Western Railway 227.88 DRM(WA) Baroda Feb-
2013
Completed
42. Tender No.RTM/MHOW-PAT ALPANI/ROB/11 : Constr uction of Road Over Bridge ( Two lane) span of 1x 30.00m on pile foundation, substructure …. in lieu of L-xing No. 260 at KM. 514/05-06 between Mhow - Patalpani station on RTM – KNW section of Western Railway 356.00 Dy. CE(C)II, Western Railway, Ratlam. June-
2013
Completed
43. Tender No.CEN00AGC 0413 /01 : Construction of (Limited Height Sub Way) RUB in lieu of L.C. No. 530 at Km.1402/28-30 between Mathura-Palwal section. 418.52 Dy.CE(C)II, NCR, Agra Jan-
2014
Completed
44. Tender No.: Dy.CE(C)II-BRC – 57 for Const ruction of Road over bridge at in lieu of LC NO. 151 at Km. 280/6-8 between station Gothangam and Sayan on Surat- Baroda section 871.23 Dy. CE(C)II Western Railway Baroda May-
2014
Completed
45. Tender No.DRM BRC 34 of 2014-15 : Proposed laying 1830mm dia MS water pipe encased in 3.00m x 3.00m RCC Box under ground Track @ km.362/19-12 between Miyagam and Lakodara Railway station on Surat – Baroda section. 146.34 DRM(WA) Baroda Oct-
2014
Completed
46. Tender No. BCT/13-14/07 : Virar- Surat section– Providing subway/ road under bridges in lieu of level crossing for L.C. Nos. 107,116 & 120 650.52 DRM(WA) Baroda Nov-
2013
Completed
47. TENDER No. : DY. CE(C) I/ADI/NCX- 212/01 :NCX-212 : Providing 1 x 1.80 x 1.20 M (Internal Dimension) RCC Box syphon by pushing canal crossing at Rly km 100/9 - 101/0, Ch. 1484 m. Between Stations Ningala - Alampar on SUNR - DLJ section. 51.50 Dy.CE (C)I, Western Railway, Rajkot Jan-
2015
Completed
48. Tender No. JMC/P&P/27/15-16 :Construction and Insertion of 1 X 7.50 X 2.67 (Internal Dimension) Precast RCC Box by Pushing technique, RCC cast in situ Box,.... of Western Railway, in Jamnagar Municipal Area, Jamnagar. 763.49 City Engineer, Jamnagar Mahanagar Seva Sadan Sept-
2015
Completed
49. Tender No : Dy.CE (C)II-BRC/65 : Const- ruction of Road over bridge in lieu of LC NO. 138 at Km. 252/8-10 near Sachin station between Virar - Surat section of Mumbai Division. 1170.72 Dy CE (C)II W.Rly Baroda August-
2015
Completed