Period of Construction |
: |
18th September – 1998’ to 03rd August – 1999’ |
Silent Features |
: |
This electrified ROB has been constructed on very busy electrified Root of Western Railway on Pile foundation with PSC Super Structure. The PSC girder has been casted at 3.15 Meter higher than 0 . HE line 25 KVA wire and has been lower. |
Cost of Project |
: |
Rs. 112/- Lacs. |
Cement Consumed |
: |
20,000 Bags. |
Excavation |
: |
5,000cm |
Steel Consumed |
: |
120 M.T. |
Period of Completion |
: |
11 Months. |
Name of Client |
: |
Dy. Chief Engineer (C), Western Railway,
Pratapnagar, Vadodara. |
|
 |