|
|
|
Construction of Road Over Bridge by PSC Super Structure with pile foundation for Western Railway at Lalbaug , Vadodara , Gujarat.The silent future of Road Over Bridge. |
(1) The launching of girders are done with help of two crane 200 MT. - 300 MT. Total 8 PSC girders. |
(2) The height of girder is 1.5 Mtr. having span 22 Mtr. , weight 57 MT. & height of erection is is 8 MT. from ground level. |
|
 |